Manufacturing Process |
tooling cost |
piece prices |
piece sizes |
labor cost |
lead times |
production rate |
cycle times |
Thermoforming
Snap-back Forming
Drape Forming
Pressure Forming
Twin-sheet Thermoforming
Vacuum Forming |
low |
vary depending on machinery |
extremely large |
high |
6-8 weeks |
high |
from 1 min |
Extrusion
Profile Extrusion
Blown Film Extrusion
Foam Extrusion
Sheet Extrusion
Pultrusion |
low |
medium |
medium |
Medium |
3-5 weeks |
high |
n/a |
Blow Molding BM
Injection Blow Molding IBM
Stretch Blow Molding SBM
Extrusion Blow Molding EBM
Injection Stretch Blow Molding ISBM |
moderately expensive |
higher than injection molded parts, but lower than
rotationally molded |
moderate |
low |
4-8 weeks |
low |
3-10 min |
Injection Molding IM
Gas Assist GAIM
Reaction RIM
Liquid LIM
2-Shot TSIM |
generally the highest |
lowest available |
very large |
low |
8 - 12 weeks |
High |
10 to 100 seconds |
Transfer Molding TM
Resin RTM
Vacuum Assisted VARTM
Low Pressure LPRTM |
low |
|
|
low |
short |
rapid |
40-45 min |
Insert Molding IM
Multiple Insert Tooling
Film insert molding FIM |
high |
|
|
low |
2 to 6 weeks |
high |
10 to 100 seconds |
|
Rotational Molding RM |
Very low |
high |
small to large |
low |
3-5 weeks |
moderate |
40-45 min |
|
Compression Molding CM |
moderate |
moderate |
large |
low |
2 to 6 weeks |
medium |
Relatively slow |
|
Dip molding |
fairly low |
fairly high |
|
|
3-7 weeks |
|
40-45 minutes |
|
Structural Foam Molding |
moderate |
moderate |
large parts |
|
|
moderate to high |
|
| Large Part Structural Foam Molding |
fairly |
typically low |
large parts |
|
|
|
|
| Urethane Foam |
low |
generally high |
|
|
short |
|
long |
| Plastic Lumber |
low |
low |
|
|
|
|
|
|
|
|
|
|
|
high |
|
| Cold pressure molding |
|
|
|
|
|
rapid |
|
| EPS (Expanded Polystyrene) |
fairly high |
low |
|
|
|
|
|